Identify wires namely Incoming Live wire, wire to Light 1 & Light 2 (where applicable) in the wall switch enclosure.

Insert and secure Incoming Live wire to LIVE-IN terminal, Light 1 wire to Load 1 and Light 2 wire to Load 2 terminal of the JDO switch respectively.

Set Remote Control Channel selector (located at the back of the switch) to the desired channels.The factory default RC channel setting for Load 1 and Load 2 is channel 1 & 2 respectively. The RC channels correspond to the green coloured buttons on the Remote control transmitter.

If you are using fluorescent light,for best performance, the glow-tube starter should be replaced with the starter (A10) provided.

For lighting load that exceeds the specification, the switch can be installed with an AC relay .

Important note for Dual Gang & Three Gang!
The power supply for the electronics is derived form Load 1 circuit;therefore light bulb for Load 1 must be in place for both switches to operate normally.This means that if Load 1 bulb blows or is removed, Load 2 and Load 3 will not operate, however, if Load 2 or Load 3 bulb blows, Load 1 will still operate normally.

Precaution!
If the lighting load consists high value capacitor (total >15 uF), e.g.in multiple fluorescent amps, the fuse or circuit breaker may trip during power up.To avoid this problem, reduce or remove the capacitor. This capacitor is for power factor correction. Removing it will not affect operation of the switch or the light.


Copyright 2001 JDO Labs Pte. Ltd.
Designed & Developed by JDO Labs Pte.Ltd